Legal Notices 4-8
ADVERTISEMENT FOR BIDS
City of Garrison
Garrison, NORTH DAKOTA
Water Treatment Plant and Supply
Line Expansion
MOORE PROJECT NO. 21164
General Notice
Owner is requesting Bids for the
construction of the project listed
above.
Bids for the construction of the Pro-
ject will be received at Garrison City
Hall located at 1 West Central Ave-
nue, PO Box 459, Garrison, ND
58540 until April 30, 2021 at 10:00
a.m. local time. At that time, the Bids
received will be “publicly” opened
and read.
The Project includes the following
Work: Rehabilitation of existing wa-
ter treatment plant, addition on to
the existing water treatment plant,
and water main construction.
Separate Bids will be received for
the following Contracts:
Contract No. Description of Contract
1. Water Treatment Plant: General
1. Water Treatment Plant: Electrical
2. Supply Line Expansion
Obtaining the Bidding Docu-
ments
Digital project bidding documents
will be available at www.
mooreengineeringinc.com by click-
ing the Bid Information tab, or at
www.questcdn.com. You may down-
load the complete set of digital docu-
ments for a nonrefundable fee of
$20.00 by locating eBidDoc†
Number7456263 on the website.
Please contact QuestCDN.com at
952-233-1632 or info@questcdn.
com for assistance in membership
registration, downloading and work-
ing with this digital project informa-
tion.
The Issuing Office for the Bidding
Documents is:
Moore Engineering, Inc.
4503 Coleman St, Suite 105,
Bismarck, ND 58503
Each bid must be accompanied by a
bidder’s bond in a sum equal to 5%
of the full amount of the bid execut-
ed by the bidder as principal and by
a surety, conditioned that if the prin-
cipal’s bid is accepted and a con-
tract is awarded to the principal, the
principal, within ten (10) days after
the notice of the award, shall exe-
cute a contract in accordance with
the terms of the bid and the bid
bond, and any conditions of the City
of Garrison, as required by law. A
countersignature of a bid bond is not
required. If the City of Garrison
elects to award a contract to the
lowest responsible bidder, and the
lowest responsible bidder does not
execute a contract within ten (10)
days, the bidder’s bond will be for-
feited to the City of Garrison, and the
City of Garrison may award the pro-
ject to the next lowest responsible
bidder.
Each bidder must possess a valid
North Dakota contractor’s license for
the full amount of their bid, as re-
quired by N.D.C.C. Section 43-07-7.
Each bidder MUST enclose a copy
of their Contractor’s License or Cer-
tificate of Renewal, issued by the
North Dakota Secretary of State,
and each license must be valid and
dated at least 10 days prior to the
date set for bid opening, as required
under N.D.C.C. Section 43-07-12.
Instructions to Bidders.
For all further requirements regard-
ing bid submittal, qualifications, pro-
cedures, and contract award, refer to
the Instructions to Bidders that are
included in the Bidding Documents.
This Advertisement is issued by:
Owner: City of Garrison
By: Stuart Merry
Title: Mayor
Date: April 1, 2021
(April 8-15-22, 2021)
NOTICE OF PETITION FOR NAME
CHANGE
IN DISTRICT COURT, WARD
COUNTY, NORTH DAKOTA
In the Matter of the Petition for
Name Change of Valerie Ann
Glasscock.
PLEASE TAKE NOTICE that a Peti-
tion in the above-entitled matter will
be filed with the Clerk of District
Court for Ward County, North Dako-
ta, requesting an Order changing the
name of Valerie Ann Glasscock
(current full, legal name) to Gabriella
Ann Gallagher (requested full, legal
name).
Pursuant to N.D.C.C. 32-28-02, thir-
ty days previous notice of the in-
tended application must be given in
the official newspaper printed in this
county. You are hereby notified that
thirty days after publication, peti-
tioner intends to file a petition re-
questing entry of the Court’s Order
changing the name of Valerie Ann
Glasscock (current full, legal name)
to Gabriella Ann Gallagher (request-
ed full, legal name). Any objection to
granting this name change must be
given in writing to the address listed
below within 30 days of the date of
this publication. The written objec-
tion must also be filed with the
Court. If no objections are given, the
Court may respond to the Petition
without further hearing.
Dated this 2nd day of April, 2021.
/s/ Valerie Ann Glasscock
Valerie Ann Glasscock
1010 43rd St. SE #4
Minot, ND 58701
(April 8, 2021)
NOTICE TO CREDITORS
Case No: 51-2021-PR-00045
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of Donna
Rae Coffin, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned have been appoint-
ed personal representatives of the
above estate. All persons having
claims against the said deceased
are required to present their claims
within three months after the date of
the first publication of this notice or
said claims will be forever barred.
Claims must either be presented to
Kyli Jo VanWinkle and Romi Jo L.
Melendez, personal representatives
of the estate in care of Brandon
Rowenhorst, Rowenhorst Law, 122
South Main, Suite D., Minot, North
Dakota 58701 or filed with the Court.
Dated this 25th day of March, 2021.
/s/Kyli Jo VanWinkle
Kyli Jo VanWinkle, Co-Personal
Representative of the Estate of Don-
na Rae Coffin
/s/Romi Jo L. Melendez
Romi Jo L. Melendez, Co-Personal
Representative of the Estate of Don-
na Rae Coffin
/s/Brandon Rowenhorst 3-25-2021
Brandon Rowenhorst
Rowenhorst Law, T: (701)340-9788,
E-Mail: Office@rowenhorstlaw.com
Attorney for the Personal Represen-
tatives
122 South Main, Suite D.
Minot, ND 58701
(April 1-8-15, 2021)
SUMMONS
CIVIL NUMBER: 51-2021-CV-00498
IN THE STATE OF NORTH
DAKOTA, COUNTY OF WARD
IN THE DISTRICT COURT, NORTH
CENTRAL JUDICIAL DISTRICT
U.S. Bank National Association,
Plaintiff,
v.
Kyle A. Sturdefant; any person in
possession, and all persons unk-
nown, claiming any estate or interest
in, or lien or encumbrance upon, the
real estate described in the com-
plaint,
Defendants.
THE STATE OF NORTH DAKOTA
TO THE ABOVE-NAMED DEFEN-
DANTS:
1. To the above-mentioned Defen-
dants including all persons unk-
nown, claiming any estate or interest
in, or lien or encumbrance upon, the
real estate described below and in
the complaint.
2. You are hereby summoned and
required to appear and defend
against the Complaint in this action,
which is herewith served upon you,
by serving upon the undersigned a
copy of an Answer or other proper
response within twenty-one (21)
days after the service of this Sum-
mons upon you, exclusive of the day
of service.
3. If you fail to do so, Judgment by
default will be taken against you for
the relief demanded in the Com-
plaint.
4. This Summons and Complaint will
be filed with the Clerk of this Court.
5. This action relates to the foreclo-
sure of a mortgage upon the follow-
ing described real property in the
County of Ward, State of North
Dakota:
Lot 24, Block 7, Northdale First Ad-
dition to the City of Minot, Ward
County, North Dakota.
Property Address: 2612 6th Street
NW, Minot, ND 58703
6. The Plaintiff is not seeking a per-
sonal judgment against the
above-named Defendants.
Date: January 21, 2021
/s/ Scott S. Skeen
Scott S. Skeen
376 East 400 South, Suite 300
Salt Lake City, UT 84111
Tel: 801-355-2886
Email: scott@hwmlawfirm.com
Bar Number: 09334
HWM: ND10238
(April 1-8-15, 2021)
THE NOTICE TO PUBLIC
Notice is hereby given that a public
hearing has been scheduled during
the commission meeting that starts
at 9:00 o’clock AM April 20th, 2021
located at Suite #218 Ward County
Administration Building by the Board
of Ward County Commission, at
which time the following application
for a moving permit will be con-
sidered:
Applicant: Aaron Ray Ottmar
Structure: 24’x30′ double stall
garage
From: 1527 Burdicck Expressway
East Minot, ND 58701
Legal: Elmwood Addn. Lot 10 and
sublot A of Lot 12 Minot Parcel #
MI190920000100
To: 7611 HWY 52 South Minot, ND
58701
Legal: Lot B of OLT 24 of SWSE,
Section 24 154-82
Any parties in interest and citizens
shall have an opportunity to be
heard on this matter at said time.
This notice is given pursuant to Sec-
tion 1, Article 22, of County Zoning
Resolution No. 6.
BOARD OF WARD COUNTY COM-
MISSIONERS
(April 8, 2021)