ADVERTISEMENT FOR BIDS
Bids for the design of the new joint
Crosby Rural Fire Protection District
and Divide County Ambulance Dis-
trict Fire and EMS Hall:
The work will include designing a
new Fire and EMS Hall located
within the city limits of Crosby, North
Dakota.
Bids must be received no later than
5 p.m., April 1, 2021. Mailed bids
must be sent to Crosby Rural Fire
Proctection District Architect Bids,
P.O.Box 84, Crosby, ND, 58730.
1. The bids will be opened at the
Crosby Rural Fire Protection District
above the Crosby City Hall on April
1, 2021 at 7:00 p.m.
2. That each bid must be accompa-
nied by a separate envelope con-
taining the contractor’s license and
bid security. The bid security must
be in a sum equal to five percent of
the full amount of the bid and must
be in the form of a bidder’s bond. A
bidder’s bond must be executed by
the bidder as principal and by a
surety, conditioned that if the
principal’s bid is accepted and the
contract awarded to the principal,
the principal, within ten days after
notice of the award, shall execute a
contract in accordance with the
terms of the bid and the bid bond
and any condition of the governing
body. A countersignature of a bid
bond is not required under this sec-
tion. If a successful bidder does not
execute a contract within the ten
days allowed, the bidder’s bond
must be forfeited to the governing
body and the project awarded to the
next lowest responsible bidder.
3. That a bidder, except a bidder on
a municipal, rural, and industrial wa-
ter supply project using funds pro-
vided under Public Law No. 99-294
[100 Stat. 426; 43 U.S.C. 390a],
must be licensed for the full amount
of the bid as required by section
43-07-12. For projects using funds
provided under Public Law No.
99-294 [100 Stat. 426; 43 U.S.C.
390a], the advertisement must state
that, unless a bidder obtains a
contractor’s license for the full
amount of its bid within twenty days
after it is determined the bidder is
the lowest responsible bidder, the
bid must be rejected and the con-
tract awarded to the next lowest
responsible bidder
4. That no bid may be read or con-
sidered if the bid does not fully com-
ply with the requirements of section
48-01.2 of the North Dakota Century
Code and that any deficient bid sub-
mitted must be resealed and re-
turned to the bidder immediately.
5. That the governing body reserves
the right to reject any and all bids
and rebid the project until a satis-
factory bid is received.
6. This project is a time sensitive
project and therefore will require a
projected completion date. The
Crosby Rural Fire Protection District
would like this project to be complet-
ed by November 30, 2021.
7.The bidder will also be required to
provide proof of insurance.
(March 19-20-22-23-24-25-26-
27-29-30-31; April 1, 2021)
ADVERTISEMENT FOR BIDS
North Dakota Department of
Transportation
Minot District Office HVAC
Improvements
1305 Highway 2 Bypass East
Minot, North Dakota 58701
Sealed Bids will be received for
NDDOT Minot District Office
HVAC Improvements until 2:00
PM local time March 30, 2021, in-
cluding all portions of Work for com-
plete construction as identified in the
Construction Documents and shall
be bid as Separate Prime Sealed
Bids for General, Mechanical, and
Electrical Construction OR One
Sealed Bid for Single Prime Con-
struction. Bids shall be addressed
and delivered to the office of:
Korby R. Seward, District
Engineer
North Dakota Department of
Transportation
Minot District Office
1305 Highway 2 Bypass East
Minot, ND 58701
At that time and place the bids will
be publicly opened and read aloud.
Proposals received after that time
will not be accepted.
The Construction Documents will be
on file and may be examined at the
Office of Ackerman-Estvold, Minot,
North Dakota and the following
Builders Exchanges: Bismarck-
Mandan, Construction Plans Ex-
change, Dickinson, Fargo, Grand
Forks, Minot, Williston, North Dako-
ta; Minnesota Builders Exchange;
Construction Industry Center, and
Sioux Falls Builders Exchange,
South Dakota.
Bidders may obtain Plans and
Specifications by contacting Sonya
Boykin at Ackerman-Estvold by
phone at 701-837-8737 or by email
at sonya.boykin@ackerman-estvold.
com and requesting a link to a
SharePoint folder containing the pro-
ject documents.
All prime contractors obtaining
plans, whether through exchanges
or directly, should direct
Ackerman-Estvold to place them on
the plan holders list.
A pre-bid conference will be con-
ducted on 2:00 PM local time
March 17, 2021 at project site.
Each Bid must be accompanied by a
separate envelope, (attached to the
Bid Envelope) containing a Bid Bond
equal to five percent (5%) of the
amount of the Bid naming North
Dakota Department of Transporta-
tion as Obligee. The Contractor
shall also enclose within the Bid
Bond Envelope a copy of the
Bidder’s North Dakota Contractor’s
License or a copy of their latest
Renewal Certificate issued by the
Secretary of State as per North
Dakota Century Code 43-07-12. All
Contractors who submit Bids must
hold a North Dakota Contractors
License in the highest amount of
their Bids and such license must
have been in effect at least ten (10)
days prior to the date of the Bid
Opening. Any Bid not containing
these documents shall not be ac-
ceptable and shall be returned to the
Bidder unopened. See AIA Docu-
ment A701 “Instructions to Bidders”
in the Project Manual for further in-
formation.
The Owner reserves the right to re-
ject any or all bids and to waive any
informalities in bidding.
The successful bidder will be re-
quired to furnish a Payment Bond,
Performance Bond, Insurance Cov-
erages and other requirements
stipulated in the Project Manual.
No Bidder may withdraw his Bid
within 30 days of the actual date of
the opening.
Korby R. Seward, District Engineer
North Dakota Department of Tran-
sportation
(March 8-15-22, 2021)
FOR YOUR INFORMATION
City of Minot
The City of Minot Board of Equaliza-
tion will meet on Tuesday, April 13,
at 5:30 p.m. in the City Council
Chambers of Minot City Hall (second
floor – 515 2nd Avenue SW).
Questions concerning this meeting
should be directed to the City Asses-
sor’s Office, from 8:00 a.m. to 4:30
p.m., at 701-857-4160.
Kelly Matalka
City Clerk
(March 22-29, 2021)
INVITATION NO: IFB 21-02
GENERAL CONSTRUCTION
IFB 21-03 ELECTRICAL
CONSTRUCTION
IFB 21-04 TOTAL COMBINED
CONSTRUCTION
INVITATION TO BID
BUILDING REMODEL
Bldgs. 2280-90 and 5220-30
Camp Gilbert C. Grafton
Devils Lake, North Dakota
Sealed bids for Building Remodel,
Bldgs. 2280-90 and 5220-30, Camp
Gilbert C. Grafton, Devils Lake,
North Dakota will be received by the
Adjutant General of the State of
North Dakota at Fraine Barracks,
Building 30, Bismarck, North Dako-
ta, until 2:00 PM, April 15, 2021, and
will be publicly read that date and
hour in the location designated. All
bids received after the scheduled
opening time will be returned to the
bidders unopened. The deadline for
receipt of technical questions is no
later than April 8, 2021.
Electronic bidding documents may
be requested. Emails must be ac-
companied by a copy of your current
North Dakota Contractor’s License
or Certificate of Renewal and your
request must be written on business
letterhead. No requests will be ack-
nowledged without receipt of both
documents. Submit request to
ng.nd.ndarng.list.dfe-contract-mana
gement@mail.mil.
Due to COVID 19, the bid opening
will not be open to the public. The
front gate entrance to Fraine Bar-
racks is closed to the general public.
A representative from the Facilities
Engineering Division will be at the
gate from 12:00 p.m. until 1:30 p.m.
CST on April 15, 2021. Bidders may
hand deliver their bids during that
time only. Delivery by courier service
or U.S. Mail are the preferred
methods for delivery.
Modifications to bids are allowed in
accordance with the instructions in
AGND Document 411, Subpara-
graph 4.4.2. Bid modifications must
be received no later than 2:00 p.m.
CST. Be advised, the receipt of
emails and faxed transmissions
have a delay time due to data secu-
rity restrictions and military firewalls.
Allow adequate time for emailed and
faxed transmissions to travel
through our security system. The
OWNER is not responsible for bid
modifications that arrive later than
2:00 p.m. CST on the day of the bid
opening. Emailed bid modifications
must be submitted to:
ng.nd.ndarng.list.dfe-contract-mana
gement@mail.mil.
To listen to the bid opening, you
may dial in:
701-333-2840
ID No. 32089#
Pin No. 32089#
Bidders may submit separate bids
for General Construction work (IFB
21-02) and/or Electrical Construction
work (IFB 21-03). In addition, the Of-
fice of the Adjutant General will al-
low the submission of a Total Com-
bined Construction Bid (single
prime) for the complete project (IFB
21-04). In compliance with NDCC
48-01.2-06, the combined bid (from
a single prime) will not be accepted
unless that bid is lower than the
combined total of the lowest respon-
sible, multiple bids for the project.
IMPORTANT: Davis-Bacon Wage
Rates are required for this project.
OWNER
Office of the Adjutant General
Contract Management Branch
P.O. Box 5511
Bismarck, North Dakota 58506-5511
Telephone: (701) 333-2068
Copies of the bidding documents are
on file at the Construction Plans Ex-
change in Bismarck; Builders Ex-
changes in Dickinson, Fargo, Grand
Forks, Mandan, Minot, Rapid City,
Impact Procurement Technical As-
sistance Center in Fargo, North
Dakota and Minnesota Builders Ex-
change in Minneapolis, Minnesota.
Each bid shall be submitted in dupli-
cate using the bid response forms
provided by the Owner, enclosed in
a sealed opaque envelope and la-
beled with the necessary information
as required by the Supplementary
Instructions to Bidders.
Each bid shall be accompanied by a
separate sealed opaque envelope
containing a bidder’s bond made
payable to The Adjutant General,
State of North Dakota, and executed
by the bidder as principle and by a
surety company authorized to con-
duct business in North Dakota, in a
sum equal to five percent (5%) of
the bidder’s highest total bid combi-
nation, including all add alternates to
the bid items; conditioned that if the
bid is accepted and the contract
awarded, the bidder within ten (10)
days after notice of such award, will
effect and execute a contract in ac-
cordance with the terms of his bid
and provide payment and perfor-
mance bonds as required by law
and the regulations and determina-
tions of the Owner. AIA Document
A310, Bid Bond, is provided in the
electronic project manual and should
be used to execute the bid guaran-
tee.
In compliance with Section 43-07-12
of the North Dakota Century Code,
each contractor submitting a bid
must have a copy of their North
Dakota Contractor’s License or certi-
ficate of renewal issued by the
Secretary of State enclosed in the
bid bond envelope; must be licensed
for the highest amount of their total
bid combination including add alter-
nates; and such license must have
been in effect at least ten (10) days
prior to the date of the bid opening.
No bid will be read or considered
which does not fully comply with the
provisions herein as to bid bond and
contractor license, and any deficient
bid submitted will be resealed and
returned to the bidder immediately.
The Owner reserves the right to hold
all legitimate bids for a period of
forty-five (45) days following the date
fixed for the bid opening. It is the in-
tent of the Owner to award a con-
tract to the lowest and best bidder.
The Owner further reserves the right
to reject any and all bids and to
waive irregularities, and shall incur
no legal liability for the State for the
payment of any monies until the
contract is awarded and approved
by the proper authorities.
In compliance with Section
48-01.2-10 of the North Dakota Cen-
tury Code, the successful bidder
shall be required to furnish payment
and performance bonds covering the
faithful performance of the Contract
and the payment of all obligations
thereunder, and all additional obliga-
tions required by the laws of the
State of North Dakota. Each bond
shall be in an amount equal to the
full contract sum.
DATED: 22 March 2021
OFFICE OF THE ADJUTANT GEN-
ERAL
Bismarck, North Dakota
By: /s/ JACKIE A. HUBER
Brigadier General, NDNG
Deputy Adjutant General
Contracting Officer
(March 22-29; April 5, 2021)
NOTICE
Burlington Planning Commission will
hold a public hearing Mar. 30, 2021
at 5:00pm at Burlington City Hall,
225 N Wallace Street. The following
public hearings will be opened:
Joshua M Nelson of 306 3rd Ave E
Burlington, ND, located inside
Burlington’s city limits.applied for a
Conditional Use permit to allow him
to sell firearms to himself, family and
close friends. Gaylin Schmidt- com-
bining outlots 71, 72 & 73 of Section
12, Township 155 N, Range 84 W,
Ward Co ND, not in Burlington City
limits. Dividing lots for Mark & Debra
Skees- Outlot 41, being a portion of
Outlot 36, Section 1, Township 155
N, Range 84 W, located inside
Burlington’s city limits. Jerry & Mary
Neuhafen- Outlot 42, being a portion
of Outlot 6, Section 1, Township 155
N, Range 84 W, located inside
Burlington’s city limits. Jason &
Nicole Schnaible- Outlot 43, being a
portion of Outlot 17, Section 1,
Township 155 N, Range 84 W, lo-
cated inside Burlington’s city limits.
The Planning Commission’s recom-
mendation will be reviewed by the
Burlington City Council at the regular
city council meeting April 5, 2021 at
7:00pm, also at the City Hall, 225 N
Wallace Street.
Mary Lynn Brooks, Auditor
(March 15-22, 2021)
NOTICE OF HEARING PETITION
FOR FORMAL PROBATE OF
WILL AND APPOINTMENT OF
PERSONAL REPRESENTATIVE
Probate No. 51-2021-PR-51
IN THE DISTRICT COURT,
STATE OF NORTH DAKOTA,
COUNTY OF WARD, NORTH
CENTRAL JUDICIAL DISTRICT
In the Matter of the Estate of
Mary E. Frunz, Deceased.
NOTICE IS HEREBY GIVEN that
Gayle D. Frunz has filed herein a
Petition for Formal Probate of Will
and Appointment of a Personal
Representative of the Estate of Mary
E. Frunz, deceased.
A hearing has been set upon said
petition on the 19th day of April,
2021, at 9:15 a.m., at the Courtroom
of the above-named Court in the
City of Minot, County of Ward, State
of North Dakota.
Dated this 4th day of March, 2021.
/s/ Brian W. Hankla
Brian W. Hankla (ID #04728)
McGEE, HANKLA & BACKES, P.C.
2400 Burdick Expy. E., Suite 100
P.O. Box 998
Minot, ND 58702-0998
ATTORNEYS FOR THE PETITION-
ER
(March 8-15-22, 2021)
NOTICE OF REAL ESTATE SALE
CIVIL NUMBER: 51-2019-CV-00638
IN THE STATE OF NORTH
DAKOTA, COUNTY OF WARD
IN THE DISTRICT COURT, NORTH
CENTRAL JUDICIAL DISTRICT
Wells Fargo Bank, N.A.
Plaintiff,
v.
Amy N. Reiter; Affinity First Federal
Credit Union; Credit Collections
Bureau; ProCollect Services LLC;
The United States of America acting
by and through the Secretary of
Housing and Urban Development;
Unifund CCR, LLC; any person in
possession, and all persons unk-
nown, claiming any estate or interest
in, or lien or encumbrance upon, the
real estate described in the com-
plaint,
Defendants.
1. Judgment in the amount of
$154,752.35, having been entered in
favor of Plaintiff and against Defen-
dants, which Judgment was filed
with the Clerk of Courts of Ward
County, North Dakota, on November
15, 2019, for the foreclosure of a
real estate mortgage.
2. Notice is hereby given pursuant to
said Judgment that the real property
described as:
Lot 1, Leier Second Addition to the
City of Minot, Ward County, North
Dakota.
Real Property address: 1111 78th
Street Southeast, Minot, ND 58701
The above real property is the sub-
ject of the Mortgage dated March
20, 2009, which Mortgagor, Amy N.
Reiter, executed and delivered to
Mortgage Electronic Registration
Systems, Inc., as Mortgagee, as
Nominee for Kirkwood Bank & Trust
CO., its successors and assigns,
and recorded in the office of the
Clerk and Recorder of Ward County,
North Dakota, on March 30, 2009,
Instrument Number 2895265, which
is subject to the entered Judgment.
Said Mortgage was assigned to
Plaintiff, its successors or assigns,
by Assignment of Mortgage record-
ed May 5, 2014, Instrument Number
2972631.
3. In order to realize the amount of
$154,752.35, as of November 15,
2019, plus interest accruing
thereafter on said amount at the rate
of 3.75% per year together with the
costs and expenses of sale, the pro-
perty will be sold subject to redemp-
tion as provided by law as one par-
cel of land at public auction, subject
to any lien for unpaid real estate
taxes and assessments of Ward
County, North Dakota, and ease-
ments and restrictions of record, to
the highest bidder for cash under the
direction of the Sheriff of Ward
County, North Dakota, at the main
entrance of the Ward County Court-
house located at 315 SE 3rd Street,
Minot, North Dakota 58701, on May
5, 2021 (“Sale Date”), at 10:00 AM.
4. If the sale is set aside for reason,
the Purchaser at the sale shall be
entitled only to a return of the depo-
sit paid. The purchaser shall have
no further recourse against the Mort-
gagor, the Mortgagee or the
Mortgagee’s attorney.
DATED this 17th day of March,
2021.
For: Robert Roed
/s/Jamie Williams
Deputy Sheriff of Ward County
Halliday, Watkins & Mann, P.C.
/s/ Scott S. Skeen
Attorneys for Plaintiff
376 East 400 South, Suite 300
Salt Lake City, UT 84111
801-355-2886
Email: scott@hwmlawfirm.com
ND Bar No.: 09334
(March 22-29; April 5, 2021)
NOTICE TO CREDITORS
Case No. 51-2021-PR-00038
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of
Ethel Mae Pagett, a/k/a Ethel M.
Pagett, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned has been appointed
personal representative of the above
estate. All persons having claims
against the said deceased are re-
quired to present their claims within
three (3) months after the date of the
first publication or mailing of this no-
tice or said claims will be forever
barred. Claims must either be
presented to Barbara J. Olson, per-
sonal representative of the
above-named estate, in care of
Louser & Zent, P.C., Town & Coun-
try Center, 1015 South Broadway,
Suite 15, Minot, North Dakota
58701, or filed with the Court.
Dated this 2nd day of March, 2021.
/s/Barbara J. Olson
Barbara J. Olson
6724 County Road 15 W.
Minot, ND 58703
Diane R. Louser (ID #03882)
LOUSER & ZENT, P.C.
Town & Country Center
1015 South Broadway – Suite 15
Minot, ND 58701
Telephone No. (701) 837-4846
Attorneys for the Personal
Representative
(March 8-15-22, 2021)
NOTICE TO CREDITORS
Case No. 51-2021-PR-00028
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the matter of the Estate of Lane
B. Sundsbak, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned have been appoint-
ed Co-Personal Representatives of
the above estate. All persons hav-
ing claims against the said de-
ceased are required to present their
claims within three (3) months after
the date of first publication or mailing
of this notice or said claims will be
forever barred. Claims must be
presented to Kelly M. Sundsbak and
Larry J. Sundsbak, Co-Personal
Representatives, in care of Miller
Law Office, P.C., Northland Profes-
sional Building, 600 22nd Ave. NW,
Suite B3, Minot, North Dakota
58703, or filed with the Court.
Dated this 26th day of February,
2021.
/s/Kelly M. Sundsbak
Kelly M. Sundsbak
Co-Personal Representative
/s/Larry J. Sundsbak
Larry J. Sundsbak
Co-Personal Representative
Marie A. Miller (ID06617)
MILLER LAW OFFICE, P.C.
Northland Professional Building
600 22nd Ave. NW, Suite B3
Minot, ND 58703
(701)838-2770
E-serve:
millerlawofficeminot@gmail.com
Attorney for the Co-Personal
Representatives
(March 15-22-29, 2021)
NOTICE TO CREDITORS
Case No. 51-2021-PR-00029
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the matter of the Estate of Leah
F. Sundsbak, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned have been appoint-
ed Co-Personal Representatives of
the above estate. All persons hav-
ing claims against the said de-
ceased are required to present their
claims within three (3) months after
the date of first publication or mailing
of this notice or said claims will be
forever barred. Claims must be
presented to Kelly M. Sundsbak and
Larry J. Sundsbak, Co-Personal
Representatives, in care of Miller
Law Office, P.C., Northland Profes-
sional Building, 600 22nd Ave. NW,
Suite B3, Minot, North Dakota
58703, or filed with the Court.
Dated this 26th day of February,
2021.
/s/Kelly M. Sundsbak
Kelly M. Sundsbak
Co-Personal Representative
/s/Larry J. Sundsbak
Larry J. Sundsbak
Co-Personal Representative
Marie A. Miller (ID06617)
MILLER LAW OFFICE, P.C.
Northland Professional Building
600 22nd Ave. NW, Suite B3
Minot, ND 58703
(701)838-2770
E-serve:
millerlawofficeminot@gmail.com
Attorney for the Co-Personal
Representatives
(March 15-22-29, 2021)
NOTICE TO CREDITORS
Probate No. 51-2021-PR-00050
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of Ted
Wiese Handeland, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned has been appointed
personal representative of the above
estate. All persons having claims
against the deceased are required to
present their claims within three
months after the date of the first
publication or mailing of this notice
or the claims will be forever barred.
Claims must either be presented to
Katherine W. Bonebrake, personal
representative of the estate, at 1082
Lake Loop Rd., Bottineau, ND
58318 or filed with the Court.
Dated this 18th day of March, 2021.
/s/Katherine W. Bonebrake
1082 Lake Loop Rd.
Bottineau, ND 58318
(March 22-29; April 5, 2021)
SUMMONS
Civil No. 51-2021-CV-00361
STATE OF NORTH DAKOTA,
COUNTY OF WARD, IN DISTRICT
COURT, NORTH CENTRAL
JUDICIAL DISTRICT
ProCollect Services, LLC,
Plaintiff,
vs.
Samantha Metcalf,
Defendant.
THE STATE OF NORTH DAKOTA
TO THE ABOVE-NAMED DEFEN-
DANT:
YOU ARE HEREBY SUMMONED
and required to appear and defend
against the Complaint in this action,
which is herewith served upon you,
by serving on the undersigned an
Answer or other proper response
within twenty-one days after service
of this Summons upon you, ex-
clusive of the day of service. If you
fail to do so, judgment by default will
be taken against you for the relief
demanded in the complaint.
Dated March 4, 2021.
/s/Christopher A. Carlson
Chistopher A. Carlson (ID #03378)
PO Box 1097
Bismarck, North Dakota 58502-1097
701-258-4800
carlsonlaw@qwestoffice.net
Attorney for the Plaintiff
(March 8-15-22, 2021)
SUMMONS
Civil No. 51-2021-CV-00362
STATE OF NORTH DAKOTA,
COUNTY OF WARD, IN DISTRICT
COURT, NORTH CENTRAL
JUDICIAL DISTRICT
ProCollect Services, LLC,
Plaintiff,
vs.
Jessie and Betsy Casey,
Defendant.
THE STATE OF NORTH DAKOTA
TO THE ABOVE-NAMED DEFEN-
DANT:
YOU ARE HEREBY SUMMONED
and required to appear and defend
against the Complaint in this action,
which is herewith served upon you,
by serving on the undersigned an
Answer or other proper response
within twenty-one days after service
of this Summons upon you, ex-
clusive of the day of service. If you
fail to do so, judgment by default will
be taken against you for the relief
demanded in the complaint.
Dated March 4, 2021.
/s/Christopher A. Carlson
Chistopher A. Carlson (ID #03378)
PO Box 1097
Bismarck, North Dakota 58502-1097
701-258-4800
carlsonlaw@qwestoffice.net
Attorney for the Plaintiff
(March 8-15-22, 2021)
SUMMONS
51-2021-DM-00111
STATE OF NORTH DAKOTA,
COUNTY OF WARD, IN DISTRICT
COURT, NORTH CENTRAL
JUDICIAL DISTRICT
Jeremy J. Davison,
Plaintiff,
vs.
Shauna R. Davison,
Defendant.
THE STATE OF NORTH DAKOTA
TO THE ABOVE-NAMED DEFEN-
DANT:
You are hereby summoned and re-
quired to appear and defend against
the Complaint in this action which
has been filed with the Ward County
Clerk of District Court, Minot, North
Dakota, and to serve a copy of your
answer or other proper response
upon the undersigned attorney
within twenty-one (21) days after the
completion of service of this Sum-
mons upon you. Service is complete
upon the expiration of fifteen (15)
days after the date of the first publi-
cation. If you fail to appear or
answer, judgment by default will be
taken against you for the relief
demanded in the Complaint.
Dated at Minot, North Dakota, this
2nd day of March, 2021.
THOMAS LAW FIRM
/s/Robert S. Thomas ID #04421
Attorney for Plaintiff
114 S. Main Street
P.O. Box 2298
Minot, North Dakota 58702
(701)852-1602
thomaslawyers@gmail.com